Shell Recharge activates 180kW DC Charger at Temerloh RNR KL Bound, over 28 months after installation
Photo: SoyaCincau
Finally after 28 months, Shell Recharge 180kW DC Charger at Temerloh RNR westbound is online. Why does it take so long to turn on a charger along the highway?
From the original report
After a long wait, the severely delayed EV Charger along LPT highway is finally online.
Shell Recharge's 180kW DC Charger at Temerloh RNR (KL Bound) is finally turned on after it was deployed over 28 months ago. This is an ideal EV charging stop for those who need to charge while travelling between Gambang and KL.
…
This is a brief of a report by another newsroom. The excerpt below is from the original.
Read the full report at SoyaCincau
SoyaCincau
Read the full translated article in Japanese →
About this story
- Source
- SoyaCincau
- Originally published
- Oct 17, 2026
- Updated here
- Oct 17, 2026
- Produced by
- Malaysia Times desk (brief) — reporting by the source
- Corrections
- Corrections log · Report an error