KL25°CRainUS$14.0835RMRM138.67JPYRON954.62RMunsubsidised
Malaysia's news, in brief.
← Back to all stories
News briefCulture

RM430 Million To Save 0.5km? Cameron Highlands' Bypass Plan And The Mountain In The Way

Malaysia Times desk Original: The Rakyat Post↗ 10/11 21:22 X
RM430 Million To Save 0.5km? Cameron Highlands' Bypass Plan And The Mountain In The Way
Photo: The Rakyat Post

A new bypass, part of a broader RM430 million federal road upgrade package, is planned to cut through the slopes of Gunung Jasar—one of Cameron Highlands' last intact ridgelines. An environmental group has formally challenged JKR, demanding proof that risking the ridge is the only way to fix the traffic…

From the original report

An environmental group has formally challenged JKR, demanding proof that risking the ridge is the only way to fix the traffic jam.

The traffic jam at Kea Farm is real — it is Cameron Highlands' main agricultural market, where produce lorries and tourist vehicles converge daily on a single strip of road heading toward Brinchang.

…

This is a brief of a report by another newsroom. The excerpt below is from the original.

Read the full report at The Rakyat Post The Rakyat Post
Read the full translated article in Japanese →

About this story

Source
The Rakyat Post
Originally published
Oct 11, 2026
Updated here
Oct 11, 2026
Produced by
Malaysia Times desk (brief) — reporting by the source
Corrections
Corrections log · Report an error